CONSTRUCTION & AEC

AI-Powered SaaS Development for Construction & AEC

Construction & AEC teams face a familiar wall: drawings, RFIs and site reality living in three places that never reconcile. Full-stack SaaS platforms with AI built in — shipped to production. Midalaxy builds it as a production system — integrated with your tools, measured against your metrics.

132+

API endpoints in one shipped platform

What this looks like in construction & aec

Drawing and specification search
RFI and submittal automation
Site progress capture from photographs

What gets automated in construction & aec

SYSTEMS IT HAS TO MEET

  • · BIM and CAD — Revit, AutoCAD
  • · project management — Procore, Autodesk Construction Cloud
  • · estimating and takeoff software
  • · document control systems

We integrate with what you already run rather than asking you to replace it.

WHAT MAKES THIS HARDER

The current drawing is whichever one the person on site is holding. Any system that cannot answer "is this the latest revision" with certainty makes the problem worse rather than better.

What governs construction & aec systems

Building regulations and standards

Compliance evidence has to be produced on demand, which makes the document trail the deliverable rather than a by-product.

Health and safety obligations

Method statements, permits and inspections carry legal weight; a system touching them inherits that.

Contractual notice periods

RFIs, variations and delay notices have contractual clocks. A routing system that loses days creates liability rather than efficiency.

Where the data actually lives

The numbers construction & aec teams manage by

RFI turnaround time

A blocked RFI stops work, and delay claims are built on the timestamps.

Rework cost

Building the wrong thing because the drawing was superseded is the expensive failure this addresses.

Schedule variance

The number the client and the contract both track.

Safety incident rate

The measure that overrides the others when it moves the wrong way.

How these projects fail in construction & aec

Answering from a superseded drawing

Worse than not answering. Revision awareness has to be built into retrieval rather than assumed from a filename.

Ignoring the site

Systems designed for the office and not for a phone in a hi-vis pocket do not get used, and the WhatsApp thread continues.

Summarising a specification

A summary that drops a clause creates a contractual problem. Citations to the exact clause are the requirement, not a nicety.

Treating every project the same

Document standards vary by client and by contract. A system tuned to one project frequently needs rework for the next.

Capabilities

Shipped, and measured

Frequently asked questions

Can you build our entire product?

Yes — we have shipped complete platforms (POS, kitchen displays, QR ordering, inventory, analytics) spanning 132 API endpoints and 53 frontend pages.

Do you handle payments and subscriptions?

We implement Stripe subscription billing with full webhook lifecycle management, trials, upgrades and dunning.

Can AI be part of the product, not a bolt-on?

That is our specialty: conversational booking/ordering agents, AI analytics and automation woven into the core product experience.

Related

SaaS Builds for construction & aec — let's scope it

Tell us what you are building. We reply within one business day.